Rainton Construction
Project
Port Of Tyne
Duration
Various
Description
Several projects successfully completed.
One contract worthy of note due to the technical difficulty and precise nature of the work was: To floor saw reinforced concrete quayside area to allow for ground excavation in order to install new anchor points.
Deep drilling (4.2m) reinforced concrete on a precise incline to hit stitch drilled surface holes pre drilled to a depth of 650mm on the quayside overhang. Care had to be taken to ensure the stitch drilled holes did not break through the overhang and that the deep drilling married up perfectly with the exact breakthrough point.
All works accurately completed on time and to budget.